Skip to content

Get breathwork done without stopping your day

You already know breathing helps. Pust Focus guides you with gentle haptic pulses while you walk, work, or wind down. No screen. No stopping.

5 TechniquesHaptic PulsesiPhone + Apple Watch
Pust Focus on iPhone and Apple Watch showing guided breathing session

You know breathwork helps. But your day doesn't have a meditation slot.

Every breathing app asks you to stop, find a quiet spot, and stare at your phone. Your Watch is already on your wrist, but the apps on it still want you to look at a screen and sit still.

So breathwork stays on the "I should really…" list. Stress compounds. Apps downloaded and forgotten.

Breathwork that fits your day

A practice built for the life you already have. No extra time. No quiet room.

WalkWorkWind down

Guided by feel, not a screen

Haptic pulses on your wrist guide each breath. Eyes closed, wrist lowered.

Your data proves it's working

Track every session, see your streaks, watch your practice build. Free.

The problem was never your motivation. It was the format.

5 science-backed techniques drawn from peer-reviewed research
Free practice data so you can see it working
Built by a UX designer with 15+ years experience who uses it daily

How it works

1

Download

Hands holding an iPhone, tapping to download Pust Focus from the App Store

Get Pust Focus on your Apple Watch

2

Pick a moment

Person walking with Apple Watch on wrist showing a breathing session

Choose something you're already doing. Walking, commuting, winding down.

3

Feel the pulse, follow along

Close-up of Apple Watch on wrist with haptic vibration waves during a breathing session

No screen. No stopping. Just breathe.

Download on the App Store

Breathe while you walk, work, or wind down

A breathing practice for every part of your day.

Walking

Breathe while you move

Working

Keep a slow, steady breath during stressful tasks

Sauna & Recovery

Deepen the relaxation response

Before Sleep

Shift from alert to rest

Stress & Anxiety

Reverse shallow breathing fast

Pust Focus preset list on iPhone with Apple Watch

A preset for every moment in your day

Walking, working, winding down. Each preset pairs a breathing technique with an activity, so you always have the right pattern ready. Pick one on your iPhone or Apple Watch and start breathing.

  • Presets built for real moments, not meditation sessions
  • Launch from your iPhone or directly on your Watch
  • Customize timing, haptic intensity, and activity
Pust Focus active breathing session on iPhone and Apple Watch

Feel the pulse, follow along

Your Watch taps your wrist at the start of each inhale, hold, and exhale. Match the rhythm. No screen to stare at, no quiet room needed. Just breathe while you keep doing what you're doing.

  • Haptic pulses guide each phase, even when the screen dims
  • See your session on iPhone or Watch
  • Duration, cycles, and heart rate tracked automatically
Pust Focus session history and progress charts

Your data proves it's working

Every session is logged automatically. Open the app and your practice is right there, building over time. No journaling, no tagging, no effort. Your breathing data makes the case for you.

  • Full session history with technique, duration, and cycles
  • Weekly and monthly charts show your consistency
  • All practice data tracked with no extra work
Pust Focus session reminders and daily goal settings

Set a goal. We help you keep it.

Pick a daily breathing target that fits your life. Add reminders for the moments you want to practice. The app nudges, you breathe. No extra discipline needed.

  • Daily goal with progress tracked automatically
  • Custom reminders tied to your preferred preset and time
  • Streaks that build momentum without pressure
Pust Focus iPhone controlling an active Apple Watch breathing session

Your iPhone and Watch, in sync

Start a Watch session from your iPhone when your Watch is under a jacket or hard to reach. See your heart rate live. After the session, type notes on your iPhone instead of pecking at a tiny Watch screen.

  • Launch, pause, and stop your Watch from your iPhone
  • Live heart rate displayed during the session
  • Add notes with a full keyboard after you breathe

5 techniques for different goals

From Navy SEAL box breathing to optimal HRV training. Each pattern serves a specific purpose.

Box Breathing

4-4-4-4

Equal phases for balance

Focus, pre-performance calm, acute stress relief

Inhale1

Resonant Breathing

5.5-5.5

Optimal HRV rhythm

HRV training, general wellness, daily practice

Inhale1

Paced Breathing

3-6

Extended exhale for calm

Anxiety relief, calming down, sleep preparation

Inhale1

Triangle Breathing

4-2-6

Focus with calm

Work focus, creative tasks, transitions

Inhale1

Post-Exhale Triangle

4-4-4

Deep stillness

Deep calm, focused stillness, winding down

Inhale1

Practice on either device

Your presets sync automatically between iPhone and Watch

iPhone

Full breathing practice

  • Haptic pulses guide your breath (hold phone in hand)
  • Create and customize presets
  • View full practice history and statistics

Apple Watch

Optimal for eyes-free practice

  • Haptics continue when screen dims
  • Built-in heart rate tracking every session
  • Start from iPhone or use standalone
  • Apple Watch Ultra: customize Action Button mid-session

A practice that sticks

Not because you became more disciplined, but because it stopped asking you to be.

Before

“I know I should do breathwork but I never find the time”

After

“My stress is actually lower and I didn't have to change my routine”

Free to start. No strings.

Everything you need to build the habit. Free. Premium unlocks the full toolkit.

Free

  • 2 breathing techniques
  • 4 activities: Meditating, Walking, Relaxing, Working
  • Voice guide with spoken cues and counting
  • Auto-stop timer per preset
  • Default presets included
  • Cross-device sync

Premium

$4.99 once
  • All 5 breathing techniques
  • Custom activities with name, color & icon
  • Unlimited custom presets
  • Full session history & statistics
  • Daily reminders
  • Family Sharing included

No subscription. Buy once, keep forever.

Start breathing. No extra time required.

Get breathwork done without stopping your day. And the data to prove your practice is working.

Download on the App Store

Requires iOS 17 or later. Apple Watch optional.